PETRO PROJECT ENGINEERING, INC. |
|
Serving Petroleum Refiners & Petrochemical Plants Worldwide since 1980 |

|
Engineers Working on Real Time Simulation—Optimization |
ASPEN—PRO II—Design II |
|
The process industries are faced with an increasingly competitive environment, ever-changing market conditions, and government regulations; yet they still must increase productivity and profitability. These business objectives can be achieved by reducing the time required to get new products to market, increasing the quantity and quality of production and designing plants for an optimum performance along their lifecycle while minimizing the risk of rework. In addition, reliable and trouble free operation is critical to maximize impact on margins. There are many barriers to achieving optimal business performance, including reduced engineering staff, processes that are more tightly integrated than ever and plants that are being operated at or above design capacity.
Steady state plant simulation is a powerful tool that helps engineers create optimal process designs based on critical business objectives. Process modeling is a powerful technology that enables managers and engineers link critical business objectives to chemical process design. The major business benefits of chemical process modeling include:
· Ensuring that equipment is properly specified to deliver the desired product throughout · Evaluating the effect of feed changes, upsets and equipment downtime on process safety, reliability and profitability · Monitoring of equipment performance against expectations · Assessment of equipment deficiencies such as heat exchanger fouling and column flooding |
|
Executing Simulators |
|
Petro Project Engineering, Inc. P. O. Box 890343 Houston, TX 77289-0343 U. S. A. |
|
Phone: 1 - (281) 470-2121 E-mail: contactus@petroproject.com |
|
To contact us: |